Project Purpose :
The Transfer Switch for Transformer Back Up aims to enable the spare transformer in the onshore MCC room to be activated quickly when the main transformer experiences
Challenge :
PT. A has Transformer 01 and Transformer 02, currently only Transformer-01 is active and used in electricity distribution for the loading area. Transformer-02 is used as a spare in case of failure of Transformer01. In this project, PT. A plans to create a Change Over Switch system for the two transformers so that when a failure occurs in one of the transformers, electricity distribution can be quickly reactivated by using a transformer that has good conditions between the two transformers.
Solution :
Thanks to Siemens LVMDB products, the panels that have been made have good reliability and quality, so that this project can run well and achieve the expected targets