Project Purpose :
Requires temperature monitoring in buildings at PLTU, needs for I/O and PLC control on the DCS that they had
Challenge :
The PLTU has a control panel with the main PLC S7-1200, it needs a program and the right accuracy to measure temperature in a relatively short time and a high panel placement.
Solution :
Thanks to TIA Portal V17 and S7-1200, this project was implemented successfully, although with a short time. commissioning also went well and without problems. So that everything can work and run well