Project Purpose :

To Installation electrical & control system Crushing Plant 8 (CP8)

Challenge :

PT. A has carried out a work contract with PT. B to build a Coal Crushing Plant (CP8), in which we are assigned the electrical scope of the project from the beginning of the process to the end of production, which includes the installation of power panels, MCC and control systems as a whole.

Solution :

Thanks to the Siemens G120, S7 1500 and WinCC, the advanced controllers are reliable, so all processes run well and without any obstacles from the commissioning process to running for the production process.

 

South Borneo

Feb 2023